Site overview

The Aijalan kaivos was a copper mine located in the village of Aijala in the former municipality of Kisko, now part of the city of Salo in Varsinais-Suomi, southwest Finland. The deposit was discovered during systematic exploration by Suomen Malmi Oy in 1945–1947, and acquired by Outokumpu Oy in 1948. The mine shaft reached a depth of 213 metres and the operation extracted 0.84 million tonnes of ore containing copper, zinc, sulphur, and minor quantities of gold and silver.

Underground copper mining ran from 1949 to 1958, with the mine officially active until 1961 when exploration for new ore ended and the shaft was allowed to flood. After its own ore was exhausted, the Aijala concentrator continued to process ore transported from the nearby Metsämonttu zinc mine through the 1950s–1970s. At its peak the mine employed around 400 people.

The main headframe tower and associated processing buildings have survived on the site. In February 2017 a collapse of the underground Itämalmi stope created a large sinkhole at the surface, releasing mine water into the Kiskonjoki river.

Set in a wooded rural landscape, the surviving tower and buildings form a compact former mining site beside water-filled workings and later ground disturbance.

Map

Map markers and directions links are provided for location reference only and do not indicate public access or permission to enter a site.
No site photograph is currently available. Images will be added as field visits are carried out.

History

The Aijala area has a documented history of small-scale mining extending back to the seventeenth century. Lead ore was extracted at Hopeamäki from 1677 to 1916, totalling some 500 tonnes, and a second lead workings at Aurums operated from 1684 to 1957. Iron ore was extracted at Helbomsissa between 1688 and 1831. These were all small operations with no permanent infrastructure of the kind later associated with the twentieth-century copper mine.

In 1945 Suomen Malmi Oy began systematic mineral exploration in the area. In 1947 two sequential copper ore deposits — referred to as Itämalmi (East ore) and Länsimalmi (West ore) — were identified at Ajosniitty in Aijala village through deep drilling. Estimated ore reserves to 175 metres depth were approximately one million tonnes at a copper grade of around 2 per cent. Outokumpu Oy purchased the deposit in spring 1948 and began construction of the mine. The main shaft, initially sunk to 118 metres, was completed in December 1948 and subsequently deepened to 213 metres during operations, with the main working levels at 115 metres and 175 metres below surface. The shaft was placed approximately 100 metres north of the ore body to avoid rock movement caused by blasting. The shaft and headframe were integrated with the crushing and concentrating plant, sited to take advantage of the natural topography.

Underground mining of copper, zinc, and sulphide ore began in 1949. An annual output target of 100,000 tonnes was set. The Itämalmi deposit on the upper level was initially worked by the magazine method, in which blasted ore was stored in the stope before being drawn off. Following a roof collapse during one extraction cycle, the mine switched to cut-and-fill stoping, where excavated areas were progressively backfilled with waste rock. Ore and waste rock were moved underground primarily by gravity to separate ore bins and then transferred in 3.5 cubic metre rail wagons on a 750mm gauge internal railway, hauled by Valmet Move41 diesel locomotives. Ore was hoisted to surface in 3-tonne skips by an electrically driven Morgårdshammar winding engine, which served two counterbalanced cages — one for personnel, one for materials. Power was supplied on a dedicated 35 kilovolt line from Virkkalaa, with a 1500 kVA transformer at the mine substation. Process water was pumped from the Kiskonjoki river via a pumping station approximately 300 metres from the plant.

The concentrator produced copper and zinc concentrates, with sulphide by-product. Total ore mined between 1949 and 1958 amounted to 835,455 tonnes at grades of 1.59 per cent copper, 0.66 per cent zinc, and 13.98 per cent sulphur, with gold at 0.7 grams per tonne and silver at 14 grams per tonne. As the Aijala ore body neared exhaustion, ore from the adjacent Metsämonttu zinc-lead mine was brought to the Aijala concentrator for processing. This arrangement operated from the early 1950s through to the mid-1970s, giving the Aijala site a processing function extending well beyond the end of its own underground production. The Aijala copper mine's active underground operations ended in 1958. Exploration for additional ore bodies continued until 1961, when these investigations were concluded without result and the shaft was allowed to flood.

At peak employment the mine and its associated works provided around 400 jobs. A residential settlement was established near the mine, including two stone apartment buildings and a row of timber semi-detached houses in the Pyykylä housing area. The mine's headframe and processing complex — a substantial reinforced concrete and masonry structure — became the defining landmark of Aijala village.

Following cessation of ore processing in the 1970s the mine buildings fell into gradual disuse. By the early 2010s the processing building and headframe tower were reportedly used for minor industrial and storage purposes. The tailings impoundment left behind approximately 2 million tonnes of sulphide-bearing tailings on an 18-hectare site discharging drainage through a run-off channel to the Kiskonjoki river. In February 2017 the ground surface above the Itämalmi underground stope collapsed without warning at the intersection of Aijalantie and Pyykyläntie, forming a sinkhole approximately 10 metres deep and 600 square metres in area. Mine water displaced by the collapse was released into the Kiskonjoki river. Emergency services and specialists from Outokumpu and the Finnish Safety and Chemicals Agency (Tukes) attended the site. Environmental investigations carried out since the collapse have confirmed ongoing metal loading to the Kiskonjoki from the former mine area, likely to continue for several centuries given the sulphide content of the tailings and the flooded mine workings.

Timeline

1677–1916
Operation

Historical lead mining at Hopeamäki

Small-scale lead ore extraction at Hopeamäki, approximately 50 metres west of the later copper ore deposit. Total production was approximately 500 tonnes over this period.
1945–1947
Exploration

Systematic exploration and discovery of copper ore

Suomen Malmi Oy began systematic mineral exploration at Aijala in 1945. In 1947 two sequential copper ore deposits, Itämalmi and Länsimalmi, were identified through deep drilling at Ajosniitty. Estimated reserves to 175 metres were approximately one million tonnes at around 2 per cent copper.
1948
Construction

Acquisition and shaft sinking

Outokumpu Oy purchased the deposit in spring 1948 and began construction. The main shaft, initially 118 metres deep, was completed in December 1948. The shaft was placed approximately 100 metres north of the ore body.
1949–1958
Operation

Underground copper, zinc and sulphide mining

Underground production ran from 1949. The shaft was deepened to 213 metres. Total ore mined was 835,455 tonnes at 1.59% copper, 0.66% zinc, and 13.98% sulphur. The concentrator produced copper and zinc concentrates. Peak employment reached approximately 400 workers.
1952–1974
Operation

Processing of Metsämonttu ore at Aijala concentrator

After Aijala's own ore was nearing exhaustion, ore from the adjacent Metsämonttu zinc-lead mine was transported to the Aijala concentrator for processing. This arrangement began in the early 1950s and continued through to 1974, extending the concentrator's active life well beyond that of the Aijala copper mine itself.
1958–1961
Closure

End of copper production and exploration

Underground copper mining ended in 1958 as the ore body was exhausted. Exploration for new ore bodies continued until 1961, when investigations concluded without result and the flooded shaft was abandoned.
2017
Closure

Collapse of Itämalmi stope and surface sinkhole

In February 2017 the ground above the Itämalmi underground stope collapsed without warning, creating a sinkhole approximately 10 metres deep and 600 square metres in area at the intersection of Aijalantie and Pyykyläntie. Mine water was displaced into the Kiskonjoki river. Emergency services, Tukes specialists and Outokumpu representatives attended the site.

Sources and records

Finnish Wikipedia: Aijalan kaivos
Geological Survey of Finland (GTK): Suomen kaivosteollisuus perusmetallikaivokset datasheet
Finnish Environment Institute (SYKE): Riskiarviointi Aijalan kaivos, 2016/2018
University of Helsinki, Department of Geosciences and Geography: Martikainen K., Aijalan Cu-Zn-Pb-kaivoksen aiheuttama metallikuormitus vesistöön ja kuormituksen mahdollinen hallinta, Pro gradu 2016
Kaivoksien ympäristöongelmat Suomessa: Aijalan kaivos article
Aatos & otos blog: Aijalan kaivos (visitor account and description)
Yle: Valtava monttu repesi maahan Salossa, February 2017
Esoteerinen maantiede blog: Matkan varrelta – Orijärven, Aijalan ja Metsämontun vanhat kaivospaikat
This researched site record is part of the HAABase Mines database. Normal personal research and browsing is welcome. Automated bulk extraction, republication, or harvesting of site text and images is not permitted without written consent.