Site overview

Zeche Friedrich Heinrich - Schacht I was the primary winding shaft of a major hard coal colliery established in Kamp-Lintfort, on the western edge of the Ruhr coalfield. The mine was founded in 1906 as an Aktiengesellschaft, and shaft-sinking at Schacht I began in 1908 using the freezing method. Production commenced on 1 July 1912.

The French concern Les Petit-Fils de François de Wendel & Cie held a majority stake from 1914 and remained the dominant shareholder until the Ruhrkohle AG absorbed the mine on 1 January 1970. The original timber headframe over Schacht I was replaced between 1955 and 1957 by a concrete winding tower approximately 79 metres high. The colliery was integrated into Bergwerk West in 2002 and ceased production on 21 December 2012.

The winding tower and the associated brick pithead buildings survive as listed monuments. The former colliery site hosted the Landesgartenschau Kamp-Lintfort 2020 and now forms the Zechenpark.

The winding tower rises from a broad redeveloped colliery site on the western edge of the Ruhr, where open public space and surviving brick buildings keep the former mine clearly legible.

Map

Map markers and directions links are provided for location reference only and do not indicate public access or permission to enter a site.
No site photograph is currently available. Images will be added as field visits are carried out.

History

The mining rights over the Friedrich Heinrich field take their name from Friedrich Heinrich Freiherr von Diergardt, who inherited them in 1869. The field was granted its formal designation in 1872. Exploratory drilling between 1901 and 1904 confirmed workable seams, and on 14 August 1906 a French banking group led by Société Générale de Crédit Industriel et Commercial acquired the field and constituted the Aktiengesellschaft Steinkohlenbergwerk Friedrich Heinrich, with its registered office in Düsseldorf. Franz Brenner was appointed mine director and entrusted with the planning and construction of the entire colliery. In 1906 and 1907 the company acquired some 1,200 Morgen of land for the surface works and the accompanying residential settlement.

Sinking of Schacht I began in 1907, with systematic freezing-method work starting in 1908, carried out by the specialist firm Tiefbau und Kälteindustrie, vormals Gebhardt und König of Nordhausen. Temporary timber-frame auxiliary buildings were erected to support the sinking operation, and a narrow-gauge railway was laid to Bahnhof Repelen for materials transport. In 1909, at a depth of 145 metres, a quicksand incursion disrupted work in Schacht I. The difficulties were overcome, and Schacht I reached the Carboniferous strata in 1911 at a depth of 307 metres. The 1. Sohle was established at 400 metres depth. Coal production commenced on 1 July 1912. Schacht I was then developed as the principal winding shaft, while Schacht II served as the ventilation shaft.

The mine had been designed from the outset for the then exceptionally high output of 5,000 tonnes per day. By 1914 daily output had reached 4,300 tonnes with a workforce of around 2,000. The French concern Les Petit-Fils de François de Wendel & Cie acquired the majority shareholding in 1914 and retained it until the formation of the Ruhrkohle AG. A coke plant with five batteries and by-products facilities was built at the Schacht I/II complex in 1913 and 1914. A residential settlement — the Alt-Siedlung Friedrich-Heinrich — was developed on the Lintforter Heide from 1907 onwards and eventually comprised some 2,500 dwellings; it formed the nucleus of the later city of Kamp-Lintfort.

The outbreak of the First World War in August 1914 led to the call-up of around half the workforce and a sharp fall in daily output, though production recovered somewhat before the armistice. During the Second World War the surface plant and the housing stock suffered bomb damage, and in early March 1945 operations were halted entirely when power supplies failed. American forces occupied the site on 5 March 1945, and limited production restarted on 18 March 1945.

Post-war reconstruction included the rebuilding of the coke plant between 1947 and 1954 with 160 new ovens; two further batteries were commissioned in 1954. In 1955, with the wash plant extended between 1953 and 1956, the decision was taken to replace the original timber headframe over Schacht I with a concrete winding tower. Construction took place between 1955 and 1957; the tower rose to approximately 79 metres and was equipped with two four-rope skip hoisting installations capable of raising raw coal at a rate designed to reach 24,200 tonnes per day in continuous operation. The tower rapidly became a landmark of the city. The winding engine house attached to Schacht I contains the two electric winding machines, both of which survive. The coke plant was closed in 1978 because the Ruhrkohle AG had excess production capacity.

The Bergbauvermögen of Zeche Friedrich Heinrich passed to the Ruhrkohle AG on 1 January 1970, and the mine was assigned to the Bergbau AG Niederrhein. In 1990 the mine entered a joint production arrangement with Zeche Rheinland, and in 1993 the merged entity was designated Verbundbergwerk Friedrich Heinrich/Rheinland. With the administrative consolidation of the Deutsche Steinkohle AG, Zeche Niederberg was merged with Friedrich Heinrich/Rheinland on 1 January 2002 to form Bergwerk West. The last coal was wound from Schacht I on 21 December 2012, after a production history of exactly one hundred years, and the mine was formally closed on 31 December 2012.

Following closure, the pithead shafts were filled. The demolition of most ancillary plant was completed by the end of 2017. The winding tower over Schacht I and the steel headframe over Schacht II were retained as listed monuments. Following a public consultation in 2017 in which two-thirds of Kamp-Lintfort residents voted for its preservation, the winding tower was conserved in a programme completed in 2019; a viewing platform was installed at approximately 67 metres and the winding machinery made accessible for guided visits. The Fördergemeinschaft für Bergmannstradition linker Niederrhein e.V. operates a mining museum, including a demonstration underground roadway, on the former site. The Landesgartenschau Kamp-Lintfort 2020 was held on the colliery grounds, which have since become the Zechenpark. The Hochschule Rhein-Waal established its Kamp-Lintfort campus on part of the site. The long brick row of workshop, administrative, and welfare buildings along Friedrich-Heinrich-Allee, constructed between about 1908 and 1914, is regarded as a largely unaltered example of early twentieth-century colliery architecture rare in the Ruhr.

Timeline

1862
Legislation

Field granted to Friedrich Freiherr von Diergardt

The Grubenfeld Humboldt was granted, and a portion later designated Friedrich Heinrich. The field eventually passed by inheritance to Friedrich Heinrich Freiherr von Diergardt in 1869.
1901–1904
Exploration

Exploratory drilling confirms workable seams

Probebohrungen carried out between 1901 and 1904 confirmed the presence of workable coal seams in the field.
1906
Legislation

Aktiengesellschaft Steinkohlenbergwerk Friedrich Heinrich constituted

A French banking group led by Société Générale de Crédit Industriel et Commercial acquired the field and constituted the Aktiengesellschaft with its registered office in Düsseldorf. Franz Brenner was appointed mine director.
1907
Construction

Sinking of Schacht I and Schacht II begins; settlement construction starts

Sinking of both shafts commenced in 1907, with systematic freezing-method work at Schacht I starting in 1908, carried out by Tiefbau und Kälteindustrie, vormals Gebhardt und König of Nordhausen. A narrow-gauge railway was laid to Bahnhof Repelen. Construction of the Alt-Siedlung Friedrich-Heinrich residential settlement also began on the Lintforter Heide.
1909
Construction

Quicksand incursion in Schacht I at 145 metres

During sinking operations, a Schwimmsandeinbruch occurred in Schacht I at a depth of 145 metres. A further incursion occurred at 244 metres in 1910. Work continued using the freezing method and both shafts were eventually completed.
1911
Exploration

Schacht I reaches the Carboniferous at 307 metres depth

Schacht I reached the Carboniferous strata in 1911 at a depth of 307 metres. The 1. Sohle was established at 400 metres depth and the Wettersohle at 350 metres.
1912
Operation

Coal production commences at Schacht I

The first coal was wound from Schacht I on 1 July 1912. Schacht I was developed as the principal winding shaft. The mine had been designed for a daily output of 5,000 tonnes; by 1914 daily output had reached 4,300 tonnes with a workforce of around 2,000.
1913–1914
Construction

Coke plant built at Schacht I/II complex

A coke plant with five batteries and by-products facilities was erected at the Schacht I/II surface complex. The first battery of 60 ovens was commissioned on 1 March 1913; a second followed in October of the same year.
1914
Legislation

Les Petit-Fils de François de Wendel & Cie acquires majority shareholding

The French concern Les Petit-Fils de François de Wendel & Cie acquired the Aktienmajorität in the Friedrich Heinrich AG in 1914 and held it until the formation of the Ruhrkohle AG.
1945
Operation

Wartime suspension and rapid resumption of production

Operations halted entirely in early March 1945 due to loss of power supply. American forces occupied the site on 5 March 1945. Limited production restarted on 18 March 1945 and reached 2,600 tonnes per day by the end of 1945.
1947–1954
Construction

Coke plant rebuilt with 160 new ovens

War-damaged coke plant rebuilt in stages between 1947 and 1954, replacing the original facility with 160 new ovens. Two further batteries were commissioned in 1954.
1955–1957
Construction

Original headframe over Schacht I replaced by 79-metre winding tower

The original timber-framed headframe over Schacht I was replaced between 1955 and 1957 by a concrete winding tower approximately 79 metres high, equipped with two four-rope skip hoisting installations. The tower became a prominent city landmark.
1968
Legislation

Ruhrkohle AG founded; Friedrich Heinrich incorporated

The Ruhrkohle AG was constituted on 27 November 1968. Following protracted negotiations with the de Wendel interests, the Bergbauvermögen of Zeche Friedrich Heinrich passed to the Ruhrkohle AG on 1 January 1970, and the mine was assigned to Bergbau AG Niederrhein.
1978
Closure

Coke plant closed

The coke plant at the Schacht I/II complex was closed in 1978 because the Ruhrkohle AG held excess production capacity across the Ruhr.
1993
Operation

Designation as Verbundbergwerk Friedrich Heinrich/Rheinland

Following the 1990 entry into joint production with Zeche Rheinland, the merged entity was formally designated Verbundbergwerk Friedrich Heinrich/Rheinland in 1993, concentrating winding at the Friedrich Heinrich Schacht I/II complex.
2002
Operation

Renamed Bergwerk West following merger with Zeche Niederberg

Zeche Niederberg, closed 31 December 2001, was merged with Friedrich Heinrich/Rheinland on 1 January 2002 to form Bergwerk West under the Deutsche Steinkohle AG.
2012
Closure

Final coal wound from Schacht I; production ends

The last Fördergefäß was raised from Schacht I on 21 December 2012, concluding exactly one hundred years of coal winding. Bergwerk West was formally closed on 31 December 2012.
2012–2017
Closure

Shaft filling and demolition of ancillary plant

Following closure, the shafts were filled and ancillary surface plant demolished. The winding tower over Schacht I and the steel headframe over Schacht II were retained. Demolition of remaining structures was completed by the end of 2017.
2017
Heritage

Citizens vote to retain winding tower; conservation completed 2019

Following a public consultation in 2017 in which two-thirds of residents voted for its preservation, the winding tower was listed as a Denkmal and conserved in a programme completed in 2019. A viewing platform was installed at approximately 67 metres and the winding machinery made accessible for guided visits.
2020
Redevelopment

Landesgartenschau Kamp-Lintfort 2020 held on former colliery site

The 18th Landesgartenschau des Landes Nordrhein-Westfalen was held on the former Bergwerk West site, 5 May to 25 October 2020, transforming the grounds into the Zechenpark. The Hochschule Rhein-Waal also established its Kamp-Lintfort campus on part of the site.

Sources and records

German Wikipedia article: Zeche Friedrich Heinrich
Rheinische Industriekultur website: Zeche Friedrich Heinrich, Kamp-Lintfort
Foerdergerueste.de: Geschichte des Bergwerks Friedrich Heinrich
Foerdergerueste.de: Aktueller Stand Bergwerk West
Rheinruhronline.de: Zeche Friedrich Heinrich in Kamp-Lintfort, parts I and II
Ruhrzechenaus.de: Friedrich Heinrich, Kamp-Lintfort
LWL Fremde Impulse: Zeche Friedrich Heinrich
NRWision: Führung durch Förderturm Schacht 1
This researched site record is part of the HAABase Mines database. Normal personal research and browsing is welcome. Automated bulk extraction, republication, or harvesting of site text and images is not permitted without written consent.