Site overview

Zeche Gneisenau was a hard coal colliery in the Dortmund district of Derne, named after the Prussian military reformer August Graf Neidhardt von Gneisenau. The colliery's origins lie in the Bohrgesellschaft Union of Neuss, founded in 1855, which obtained concession rights over the Union fields in 1872. The Gewerkschaft Gneisenau received its building permit on 3 September 1873 and shaft sinking began that year, though severe water ingress in 1875 halted operations until 1882, when a Belgian-led takeover under director Eugen Tomson enabled resumption of works.

Production began in 1886. The Harpener Bergbau AG took over in 1891. Over the following decades the colliery expanded into one of the largest in Europe, incorporating Zechen Scharnhorst, Kurl, Preußen, Victoria and others into an eventual concession of 69.8 km².

The 1930 Tomson-Bock over Schacht 2, erected in 1885–86, is the oldest surviving steel headframe in the Ruhr and the last of its type on the European continent. The 52-metre Doppelbockgerüst over Schacht 4, installed in 1933–34, is architecturally unique. Production peaked at 4.2 million tonnes in 1974.

The colliery closed on 4 August 1985; the coke works closed in 1989. Both surviving headframes with their machine houses have been Baudenkmale since 1989 and are held by the Stiftung Industriedenkmalpflege und Geschichtskultur.

The surviving headframes stand in a mixed urban and post-industrial landscape at Derne, where the former colliery remains strongly legible through the scale of its preserved structures.

Map

Map markers and directions links are provided for location reference only and do not indicate public access or permission to enter a site.
No site photograph is currently available. Images will be added as field visits are carried out.

History

The history of Zeche Gneisenau begins with the Bohrgesellschaft Union, founded in 1855 in Neuss, which between 1858 and 1872 prospected eight coal fields that were consolidated in 1872. Following the granting of these Union fields, the Gewerkschaft Gneisenau received building permission on 3 September 1873. Shaft sinking commenced immediately, but on 27 March 1875 water-bearing strata were struck at 173 m depth and the shaft flooded within six hours, forcing operations to stop.

For financial reasons the work could only be resumed after the conversion of the Gewerkschaft into an Aktiengesellschaft and the takeover by a Belgian enterprise. Under the direction of Eugen Tomson — a Belgian engineer trained at the University of Liège who had come to Germany in 1872 and became Bergwerksdirektor of Zeche Gneisenau from 1882 to 1900 — work restarted on 1 June 1882. The mine floor (Schachtsohle) was reached at 383 m in 1886, and coal winding commenced.

In 1886 and 1887 the headframe and machine house for Schacht 2 were erected; the Tomson-Bock, a modified form of the English Bock type, was designed by Tomson himself and first erected in this form over Schacht 1 of Gneisenau in 1886. It became the standard headframe form for the Harpener Bergbau AG, which had 26 such frames erected over its various shafts. By 1890 annual output stood at approximately 230,000 tonnes.

In 1890 the coke works was brought into operation, processing the coal raised at the colliery. In 1891 the Harpener Bergbau AG took over the Zechen Gneisenau, Scharnhorst, and Preußen. Around 1895 the workforce numbered approximately 1,000.

In 1887 a firedamp explosion killed 15 workers; in 1902 an explosion of explosives on the colliery yard killed 13. In 1899 the Zeche Kurl was incorporated, and in 1908 the Gewerkschaften Victoria and Kobold near Lünen came under Harpener control. In 1903 a third shaft — Schacht 3 — was sunk; all three shafts received Tomson-Böcke of the same design, of which the one over Schacht 2 (built 1885–86) alone survives.

A modern Zentralkokerei was erected in 1927–28 to replace the older works, and was extended in 1929 with a large Gasometer. The ventilation shaft Grevel, sunk 1925–27 to serve Zeche Preußen and taken over after Preußen's closure in 1929, was also operated by Gneisenau. In 1930 a colliery railway was brought into service connecting the Schachtanlage Gneisenau to the Preußenhafen on the Datteln-Hamm-Kanal at Lünen-Süd; the harbour had been opened in 1914.

By the merging of the various subsidiary collieries, the construction of a fourth shaft became necessary; Schacht 4 entered service on 10 September 1932, and in 1933–34 the architecturally unique 52-metre Doppelbockstrebengerüst — a double-braced double headframe, designed to fit the cramped site — was brought into service over it, replacing Schacht 4 as the Zentralförderschacht. In the machine houses of Schacht 4 the original twin steam winding engines survive. In 1925 the Zeche Massener Tiefbau at Unna was incorporated.

By 1935, with 2,500 workers, output exceeded one million tonnes for the first time. During the Second World War prisoners of war were employed at the colliery, housed in a barracks camp on the Derner Straße. Allied bombing severely damaged the surface installations.

Production was resumed two months after the end of the war in 1945 and was continually increased thereafter. In 1963 an underground connection (Verbund) was made with the Zeche Victoria in Lünen, and the headframe over Schacht 3 was rebuilt with a Fritz Schupp-designed 68-metre concrete winding tower with automated skip hoisting, which replaced Schacht 4 as the central winding shaft. In 1969 the Zeche Gneisenau became part of the Ruhrkohle AG.

By 1970 the colliery, with 6,000 workers and over 3 million tonnes annual output, was the largest colliery in the Ruhr. In 1971–77 hydromechanical mining was tested in steeply inclined seams but proved uneconomic. The highest annual output of 4.2 million tonnes was achieved in 1974 with more than 6,300 workers, making Gneisenau one of the largest collieries in Europe.

The total concession at its greatest extent, incorporating Gneisenau, Scharnhorst, Kurl, Preußen I, Preußen II, and Victoria, covered 69.8 km². A coke-works explosion on 17 July 1974 killed two workers and injured 13 more and caused damage of 10 million DM, destroying a pipe bridge carrying 42 lines. Coal production was halted on 4 August 1985.

The coal from the Victoria 1/2 and Kurl 3 fields continued to be raised via the Zeche Haus Aden until 1991 and 1998 respectively. The coke works operated until its closure in 1989; the colliery power station closed in 1990. Schacht 4 served as an inspection shaft for the central mine-water pumping until 1999, after which all shafts were backfilled.

Of the large site, only two headframes survive: the Tomson-Bock over Schacht 2 with its machine house, and the Doppelbockgerüst over Schacht 4 with its two machine houses. Both were listed as Baudenkmale in the Denkmalliste der Stadt Dortmund in 1989. In 1995 both structures passed into the ownership of the Stiftung Industriedenkmalpflege und Geschichtskultur.

In 2006 a retail centre was constructed by Montan-Grundstücksgesellschaft mbH on parts of the former colliery land. The former colliery railway trackbed is now used as the Gneisenau-Trasse cycle and walking path. The Förderkreis Zechenkultur Gneisenau e.V. maintains the northern machine house of Schacht 4 and its historic steam winding engine as a publicly accessible industrial heritage site, open for guided visits and used as a civil registry office for weddings.

Timeline

1855
Exploration

Bohrgesellschaft Union founded in Neuss; coal field prospecting begins

The Bohrgesellschaft Union was founded in Neuss in 1855. Between 1858 and 1872 it prospected eight coal fields which were consolidated in 1872 and granted as the Union fields.
1873
Legislation

Gewerkschaft Gneisenau receives building permit; shaft sinking begins

The Gewerkschaft Gneisenau received its building permit on 3 September 1873, and shaft sinking commenced immediately. The colliery took its name from the Prussian military reformer August Graf Neidhardt von Gneisenau.
1875
Construction

Water ingress at 173 m halts shaft sinking

On 27 March 1875 water-bearing strata were struck at 173 m depth; the shaft flooded within six hours and work was halted. Financial difficulties prevented resumption until the colliery was converted into an Aktiengesellschaft and taken over by a Belgian enterprise.
1882
Construction

Shaft sinking resumes under director Eugen Tomson

Work on the shaft resumed on 1 June 1882 under the direction of Eugen Tomson, a Belgian engineer who became Bergwerksdirektor from 1882 to 1900. Tomson resolved the water-ingress problems and drove the shaft to its final depth.
1885–1886
Construction

Headframe (Tomson-Bock) and machine house over Schacht 2 erected

The headframe and machine house for Schacht 2 were erected in 1885–86. The Tomson-Bock over Schacht 2 is a modified English Bock type developed by Eugen Tomson and is today the oldest surviving steel headframe in the Ruhr and the last example of this type on the European continent.
1886
Operation

Coal production commences; shaft floor reached at 383 m

The shaft floor was reached at 383 m in 1886 and coal winding commenced. By 1890 annual output stood at approximately 230,000 tonnes.
1887
Operation

Firedamp explosion kills 15 workers

In 1887 a firedamp explosion at the colliery killed 15 workers.
1890
Construction

Coke works brought into operation

In 1890 the colliery's coke works was brought into operation, processing the coal raised at the site.
1891
Legislation

Harpener Bergbau AG acquires Zeche Gneisenau, Scharnhorst, and Preußen

In 1891 the Harpener Bergbau AG took over the Zechen Gneisenau, Scharnhorst, and Preußen, beginning a long process of incorporating neighbouring collieries into the growing Gneisenau operation.
1902
Operation

Explosion of explosives on the colliery yard kills 13 workers

In 1902 an explosion of explosives on the colliery yard killed 13 workers.
1903
Construction

Third shaft, Schacht 3, sunk

In 1903 a third shaft — Schacht 3 — was sunk at the colliery. All three shafts received Tomson-Böcke headframes of the standard Harpener design.
1927–1929
Construction

Modern Zentralkokerei erected; Gasometer added

A modern Zentralkokerei was erected in 1927–28 to replace the earlier coke works, and was extended in 1929 with a large Gasometer.
1930
Construction

Colliery railway to Preußenhafen on Datteln-Hamm-Kanal enters service

In 1930 the colliery railway connecting the Schachtanlage Gneisenau to the Preußenhafen on the Datteln-Hamm-Kanal at Lünen-Süd was brought into service. The harbour had been opened in 1914.
1932–1934
Construction

Schacht 4 sunk and Doppelbockstrebengerüst erected as new Zentralförderschacht

Schacht 4 entered service on 10 September 1932. In 1933–34 the architecturally unique 52-metre Doppelbockstrebengerüst was erected over it and replaced Schacht 4 as the Zentralförderschacht. The twin steam winding engines in the two machine houses survive.
1935
Operation

Annual output exceeds one million tonnes for the first time

In 1935, with 2,500 workers, output exceeded one million tonnes for the first time.
1963
Construction

Underground connection to Zeche Victoria, Lünen; Schacht 3 rebuilt with Fritz Schupp concrete tower

In 1963 an underground connection (Verbund) was made with the Zeche Victoria in Lünen. The headframe over Schacht 3 was simultaneously rebuilt with a Fritz Schupp-designed 68-metre concrete tower with automated skip hoisting, which replaced Schacht 4 as the Zentralförderschacht.
1969
Legislation

Zeche Gneisenau becomes part of Ruhrkohle AG

In 1969 the Zeche Gneisenau was incorporated into the Ruhrkohle AG.
1974
Operation

Peak annual output of 4.2 million tonnes; 6,300 workers employed

In 1974 annual output reached 4.2 million tonnes with more than 6,300 workers, making Gneisenau one of the largest collieries in Europe. In the same year a coke-works explosion on 17 July killed two workers and injured 13, destroying a pipe bridge and causing 10 million DM of damage.
1985
Closure

Coal production halted; colliery closed

Coal production was halted and the colliery closed on 4 August 1985.
1989
Heritage

Coke works closed; headframes and machine houses listed as Baudenkmale

The coke works closed in 1989. In the same year the Tomson-Bock over Schacht 2 with its machine house and the Doppelbockgerüst over Schacht 4 with its two machine houses were entered into the Denkmalliste der Stadt Dortmund as Baudenkmale.
1990
Closure

Colliery power station closed

The colliery power station ceased operation in 1990.
1995
Heritage

Surviving headframes pass to Stiftung Industriedenkmalpflege und Geschichtskultur

In 1995 both surviving headframes and their associated machine houses passed into the ownership of the Stiftung Industriedenkmalpflege und Geschichtskultur, securing their long-term preservation.
1999
Closure

Schacht 4 ceases mine-water pumping duties; all shafts backfilled

Until 1999 Schacht 4 had served as an inspection shaft for the central mine-water pumping operation. After that date it and all remaining shafts were backfilled.
2006
Redevelopment

Retail centre erected on part of former colliery land

In 2006 the Montan-Grundstücksgesellschaft mbH erected a retail centre on parts of the former colliery land.

Sources and records

German Wikipedia article: Zeche Gneisenau
Stiftung Industriedenkmalpflege und Geschichtskultur official site: Zeche Gneisenau (industriedenkmal-stiftung.de)
Baukunst-NRW object record: Zeche Gneisenau
Ruhrgebiet-Industriekultur.de: Zeche Gneisenau und Umgebung
Ruhrzechenaus.de: Zeche Gneisenau in Dortmund-Derne
Lokalkompass Dortmund-Nord: Die Fördertürme der Zeche Gneisenau
Dortmund.de Tag des offenen Denkmals 2021: Zeche Gneisenau, Schacht IV nördliches Maschinenhaus
KuLaDig Kulturlandschaft digital: Zeche Gneisenau, Schacht II/III/IV in Derne (Kulturlandschaftsbereich Regionalplan Ruhr 444)
Gabriele Unverferth (Bearb.): Kohle, Koks und Kolonie. Das Verbundbergwerk Gneisenau in Dortmund-Derne, Aschendorff Verlag, Münster, 2020