Site overview
Staříč I/1, also called the Sviadnov exhaust shaft, formed part of the large Důl Staříč coking-coal enterprise in the southern Ostrava–Karviná coalfield of the Czech Republic. The Sviadnov plant was Staříč I, distinct from the principal production plant Staříč II near the village of Staříč and Staříč III at Chlebovice. The outstanding surviving feature is the original circular reinforced-concrete winding tower of the exhaust-air shaft, built between 1964 and 1966 to an experimental design attributed to engineer Ivo Lange.
Its glazed, expanded head contains an unusual Koepe winding-engine installation; the shaft handled ventilation, materials and exceptional personnel travel rather than raising coal. A second intake shaft, Staříč I/2, was constructed in the 1980s and was linked underground to I/1 and the wider complex. Ventilation at Sviadnov stopped in May 2014, and both shafts were backfilled in 2019.
The larger lattice tower of I/2 was dismantled in 2020. The surviving I/1 tower was designated a cultural monument in November 2000 and remains an uncommon example of post-war mining engineering.
Map
History
Exploration of the southern coalfield
The Sviadnov shaft belonged to the southernmost part of the Ostrava–Karviná coalfield, where the development of deep reserves beneath the northern approaches to the Beskydy Mountains created the extensive Důl Staříč enterprise. The mining area exceeded 40 square kilometres and was divided into several separately situated plants. Staříč I was established at Sviadnov, to the north-east of Staříč village; Staříč II was developed at Staříč itself and Staříč III at Chlebovice, with an auxiliary Staříč IV locality at Rychaltice.
Each had its own shaft installations, connected at depth through the developing network of roadways. The principal product of the combined enterprise was hard coal suited to coking. Early reconnaissance around Paskov included exploratory boreholes in 1901–1902; a new investigation borehole was made in the Staříč area in 1950, followed by systematic exploration at Sviadnov from 1954.
The conditions indicated a complex geological structure and particularly difficult methane conditions, requiring careful planning of ventilation and underground access.
Design and construction of the concrete tower
Preliminary construction at Sviadnov began in 1962. The original plan envisaged conventional temporary shaft-sinking equipment, subsequently replaced with permanent winding arrangements. At the turn of 1963–1964 the collar of the exhaust-air shaft Staříč I/1 was prepared.
An alternative design for its tower, considered by the mine investment commission in August 1963, allowed a single definitive structure to serve both the sinking phase and later operation. The design was prepared under engineer Ivo Lange, associated with VOKD, and construction of the tower using sliding formwork extended from June 1964 until September 1966. Its form is immediately recognisable: a tall, cylindrical, reinforced-concrete shaft surmounted by a wider, glazed, truncated-conical machinery room.
The design gave the headroom and strength needed for shaft sinking, while avoiding the cost and disruption of a separate temporary winding tower. Contemporary engineering comparisons calculated a substantial reduction in construction time, expenditure and labour. The arrangement was an unusual experiment in Czechoslovak colliery engineering, borrowing an architectural silhouette more often associated with observation or television towers than with winding installations.
Winding machinery and tower engineering
Measured from ground level to its roof slab, the concrete winding tower stands approximately 35.30 metres high. Its cylindrical wall rises as a continuation of the shaft lining, founded on a separate reinforced-concrete footing below ground. The upper glazed machinery section was assembled with steel vertical and horizontal members, with areas of coloured light-blue glazing.
Within the tower the winding installation used a four-rope ČKD 4K 2010 L friction or Koepe system. Its 2,000-millimetre drive wheel was 1,000 millimetres wide and was driven by a 250 kW asynchronous electric motor through a reduction gearbox. The installation was rated for a 4,000 kg useful load at up to 5.5 metres per second.
A single-deck cage with counterweight could carry two 1.25-cubic-metre mine cars, one behind the other. A steel spiral staircase and small lift provided internal access to the head of the tower, and a suspended plumb line permitted checks of its vertical alignment. These details are significant because the machinery arrangement was closely integrated with the tower's distinctive geometry rather than housed in a conventional detached winding house.
Ventilation and the two Sviadnov shafts
Staříč I/1 was principally an exhaust-air shaft, not the shaft through which the main Staříč mine raised its saleable coal. Its winding equipment carried material and allowed exceptional travel by workers for maintenance and shaft operations. The shaft was approximately 578 metres deep, with winding access to the second working level at about 558 metres.
The broader Sviadnov project was interrupted in 1965 and resumed on a substantial scale only in the 1980s. In 1984 the neighbouring intake-air shaft Staříč I/2 was developed, providing a second and distinctly different shaft installation. That shaft reached approximately 907 metres depth and had a conventional steel lattice headframe about 55 metres high.
The shafts were linked at the second underground level, and the Sviadnov system communicated with the rest of Staříč through workings at the third level. Thus the two visible towers at Sviadnov once represented two complementary ventilation and service functions, even though only one of them had the striking circular-concrete form.
Integration with Staříč and Paskov
Coal production began across the larger Staříč enterprise in 1971, reaching its design capacity in the following decade, while the interconnected works were progressively expanded and reorganised. The connected mine eventually produced around 47 million tonnes of hard coal, chiefly for coking. Sviadnov's distinctive role was to support that production through mine ventilation and ancillary access.
Organisational changes later brought the Staříč undertaking into the Důl Paskov grouping. As production in the Sviadnov field wound down, the surviving underground connections allowed its ventilation installation to serve workings elsewhere in the combined complex. A state closure and financing decision in the early 2000s described the creation of explosion-resistant barriers and modifications to the ventilation network as preliminary measures for the eventual withdrawal from the Sviadnov shafts; the timing was necessarily dependent on the continued operation of other mine districts.
Heritage protection and closure
The architectural importance of the concrete winding tower was officially recognised on 13 November 2000, when it was declared a Czech cultural monument. It is recorded under heritage register number ÚSKP 50524/8-4065. The protected feature is the experimental tower above I/1 at Sviadnov, not the much taller lattice structure above the neighbouring I/2.
By this time the industrial setting had changed significantly. On 2 May 2014 the main ventilation fans were stopped and the Sviadnov locality passed into conservation status. The final coal was raised from the wider Staříč–Paskov complex on 31 March 2017, ending active extraction at the connected colliery.
Shaft filling and surviving structures
The physical closing of the Sviadnov shafts followed in 2019. Work began in August to fill both shafts, which were about 7.5 metres in diameter but differed in depth and in their intended treatment after closure. The exhaust shaft I/1 was filled using loose material.
At I/2, a concrete plug and a cement-and-fly-ash filling method were used to accommodate the planned recovery of mine methane. The distinction matters: future gas recovery relates to the altered and sealed neighbouring intake shaft, rather than evidence that the protected I/1 winding machinery resumed operation. In November 2020 the 55-metre steel lattice winding tower of I/2 was dismantled, leaving the distinctive circular concrete tower as the defining above-ground survival of the Sviadnov plant.
Its concrete fabric and unusual glazed machinery room preserve an important example of the ambitious shaft-engineering solutions adopted during the expansion of the southern Ostrava–Karviná coalfield, set within the increasingly fragmented remains of the former colliery site.
Timeline
Construction of the experimental Staříč I/1 winding tower
Coal production begins at the connected Staříč colliery
Development of neighbouring Staříč I/2 intake shaft
Staříč I/1 winding tower declared cultural monument
Ventilation at Sviadnov ceases
Final coal extraction in connected Staříč–Paskov mine
Staříč I/1 exhaust shaft filled
Neighbouring I/2 lattice headframe dismantled
Sources and records
View fact-check assessment and classification
The history, timeline and surviving-site classification shown here reflect the reviewed account.
The record identifies Staříč I/1 as the exhaust-air and auxiliary materials shaft at the Sviadnov (Staříč I) plant, distinguishable from the main Staříč II plant at Staříč and the companion Sviadnov intake shaft I/2. Detailed specialist technical history, a Czech administrative record, the heritage registration and contemporary mining-union and national broadcaster reporting establish the original experimental concrete winding tower, its design and equipment, its cultural-monument designation in 2000, cessation of active ventilation in 2014, shaft filling in 2019 and the removal of the adjacent I/2 lattice tower in 2020. The history and main site milestones are strongly evidenced, although parts of the wider colliery chronology concern connected installations rather than the specific exhaust shaft.
Uncertainty remains about the current internal condition of the preserved tower, the exact mapped centre of the structure and the extent of adjoining buildings.
The surviving site is centred on the circular reinforced-concrete winding tower above the former exhaust-air shaft Staříč I/1 at Sviadnov. Its cylindrical concrete shaft and glazed, broadened machinery head make it an original winding headframe standing in the altered industrial setting of a former coal mine. It is classified as an isolated headframe in an industrial setting because the nearby 55-metre lattice tower at the separate I/2 intake shaft was dismantled in 2020 and the mine shafts were filled in 2019.
The authenticity is mixed: substantial original tower fabric survives, whereas the underground shaft is sealed and much of the ancillary mining infrastructure has been altered or lost. The mine commodity was hard coal, particularly coking coal; I/1 itself did not wind coal output. The assessment is supported by contemporary 2019 and 2020 accounts, detailed specialist engineering history and the monument registration.
Exact present condition and surviving internal machinery need an updated on-site inspection.
This list includes live sources already held for the record and any additional sources added or confirmed during the published fact-check review.
Official heritage records
Further sources
- Důl Sviadnov — Zdař Bůh.cz
- Experimentální těžní věž na lokalitě Sviadnov Dolu Staříč — technical history
- Experimentální těžní věž na lokalitě Sviadnov Dolu Staříč — machinery and monument
- Ve Sviadnově začalo zasypávání důlních jam
- Dominanta Sviadnova zmizí. Společnost OKD začala bourat těžní věž bývalého dolu
- Důl Staříč v kostce
- DIAMO odstřelilo skipovou věž ve Staříči
Additional research bibliography
iuhli.cz article: Důl Staříč v kostce
FM Deník: Důl Staříč mizí z mapy, demolice pokračují, November 2024
FM Deník: Společnost DIAMO odstřelila skipovou věž ve Staříči, March 2026
FM Deník: Reportáž z Dolu Staříč po ukončení těžby, 2024
Czech Wikipedia article: Důl Paskov
Zdař Bůh.cz: Výbuch na Dole Staříč II 22. února 1975
Zachranar.cz: Důl Staříč 1975